New executives in C-level roles, including CEO, CFO, COO, CIO, CRO and CPO.
First 90 Days in a Day
Create traction from day one.
27–46% of executive transitions are regarded as failures or disappointments after two years, according to research reviewed by McKinsey.
An intensive one-day intervention, prepared through stakeholder interviews and followed by targeted alignment.
A sharp picture of what success requires and a practical 180–360 day roadmap.
Preparation
Strong preparation starts with an unfiltered view of the organisation, the role and the expectations around the new leader.
We start with an intake covering the role, the organisation, the agenda, the current structure and the context in which the leader is starting.
We then speak with around ten relevant stakeholders around the leader: people above, alongside and below them and, where relevant, board or supervisory-board members. The interviews surface expectations, blind spots, political dynamics and cultural patterns that are not always expressed directly.
From personal landing to a concrete roadmap.
The day moves through three connected parts: the leader's landing, three areas that will largely determine success, and a practical 180–360 day action plan.
Landing: person, context and legacy
The day begins with the leader. What drives them, why does this role matter and what do they recognise in the stakeholder feedback? We then make explicit the legacy they want to leave, alongside fears, blockers and personal pitfalls.
- What do you want to be proud of after several years?
- What should people later name as your contribution?
- Which tensions or blockers could get in the way?
Three lenses on what will determine success
Organisation design and team
We look at the structure, the quality and potential of the inherited team, where early changes may be needed, and which cultural qualities will help or hinder the desired legacy.
Stakeholders and influence
Map the critical formal and informal stakeholders, the relationships needed with each, and the actions required to build support, alignment and workable relationships.
Priorities and cultural feasibility
Bring the insights back to a limited number of priorities. Decide what is urgent, what matters most, what can wait, and what in the existing culture should be used, protected or changed.
Action plan for 180–360 days
The choices from the landing and the three modules are brought together into a concrete roadmap. Actions at team, stakeholder and organisation level are placed in time and tied to the people who can help make them happen.
- What needs to happen in the first 30, 90, 180 and 360 days?
- Who needs to be involved, and who needs a clear mandate?
- What evidence will show that traction is building?
Turn the day into sustained traction.
The output becomes a shared guide for the leader, the team and the critical stakeholders involved in the transition.
Report-out and team alignment
We turn the day's output into a clear report that the leader can share with the team, making the choices transparent and giving the team a common guide for execution.
Stakeholder feedback loop
Because key stakeholders contributed beforehand, they can see their concerns reflected and be deliberately involved in what happens next.
Three principles keep the day focused and useful.
Good preparation makes the difference.
Stakeholder interviews often surface information that would not otherwise emerge and form a critical part of the value.
Fully focused on the leader's success.
The day is designed around what the leader needs to land successfully and create traction. Specialist topics only enter where they directly serve that challenge.
End with concrete choices and actions.
The value lies in sharp choices, concrete actions, involved people and a clear time horizon.
Starting a new C-level role?
Let's discuss what would help you land well, align quickly and create traction in the first 180–360 days.
Contact us